Illinois highway program unveiled

<p class="p1">The Illinois Department of Transportation, IDOT, on May 14 released a six-year, $8.4 billion highway construction plan.</p><p class="p2">The proposed plan includes $32 million in projects in the Union County area.</p><p class="p2">The department said in a news release that the construction plan "fixes and improves roads and bridges throughout the state, but anticipates a rapid deterioration in the overall condition of Illinois infrastructure due to a lack of sustainable investment." </p><p class="p2">“While this latest multi-year program will have a positive impact on many of our communities, it also underscores the urgency to find a long-term, sustainable solution for our infrastructure needs,” said Acting Illinois Transportation Secretary Randy Blankenhorn. </p><p class="p2">“A high-quality transportation network is a job creator and economic asset. But just maintaining our existing system will be a challenge, with the ability to take on any new projects extremely difficult.” </p><p class="p2">Based on current state and federal funding levels, the Fiscal Year 2016-2021 Proposed Highway Improvement Program is focused on maintaining the existing system by improving 1,431 miles of highway and 357 bridges. </p><p class="p2">Projects in the Union County area are included in the plan. </p><p class="p2">Major projects during the Fiscal Year 2016-2021 time frame that were posted on IDOT's website include:</p><p class="p2">Interstate 57/U.S. Route 51 at Township Road 277, 1.2 miles north of the Pulaski County line in Union County. A bridge replacement is programmed  during FY 2017-2021 at a cost of $5 million.</p><p class="p2">Interstate 57 at Illinois Route 146 interchange in Union County. A bridge replacement is programmed during FY 2017-2021 at a cost of $6.1 million.</p><p class="p2">Interstate 57 (northbound) from 0.5 of a mile north of Illinois Route 146 to Interstate 24 in Union and Johnson counties. Reconstruction of 12.7 miles of the northbound lanes is programmed during FY 2017-2021 at a cost of $18.1 million.</p><p class="p2">U.S. Route 51 from Makanda Road to Illinois Route 146 in Anna in Jackson and Union counties. Resurfacing on 10.9 miles of highway is programmed in FY 2016 at a cost of $2.8 million.</p><p class="p2">Of the $8.4 billion identified in the program, $1.85 billion will be invested in Fiscal Year 2016. </p><p class="p2">While 83 percent of state highways and 93 percent of bridges are in acceptable condition today, conditions are poised to decline. </p><p class="p2">By the end of Fiscal Year 2021, just 62 percent of highways and 86 percent of bridges will be in acceptable condition.</p><p class="p2">For the last month, Blankenhorn and IDOT have been on a statewide listening tour to hear about the infrastructure needs and priorities from residents, business and stakeholders who rely on the state’s transportation system. </p><p class="p2">A final report will be presented to the governor’s office and the General Assembly after the tour wraps up May 22.</p><p class="p2">The multiyear program in its entirety can be viewed at goo.gl/gLOqt7. </p><p class="p4"> </p>


        Archive Section: 

        The Gazette-Democrat

        112 Lafayette St.
        Anna, Illinois 62906
        Office Number: (618) 833-2158
        Email: news@annanews.com

        Sign Up For Breaking News

        Stay informed on our latest news!